Breakthrough Installation
Because the assemblies are shipped directly to a project site, no costly onsite fabrication is necessary. The water bed supports are setup without the need for heavy equipment, and the mirror support structures, complete with mirrors pre-installed, are literally clicked in place by hand. This is a radical breakthrough in onsite labor reduction that promises further dramatic cost reduction in CSP.
Our Partners & Supporters



